Sunday, October 23, 2016

At Big Al's loading the looms.


Coming out of the storage unit, then down and around the hall.

Onto the trailer with the largest piece.

One side of the loom w/ pieces packed into open places


The final pieces for that side.


The other side of the loom with the 2nd loom packed into those open places.

The front of the trailer w/ a box of WD parts, then the 2nd loom's bench and WD canisters stacked on top.



No comments:

Post a Comment